代写program编程、代做C/C++,Java程序
Assessment task 2
Outcomes covered 3 and 4
Assessment task instructions
You should refer back to the Mercury Logistics case study provided.
John Smith would like you to plan and schedule the marketing survey project for Mercury Logistics, using project management software. You will follow the following assessment tasks in sequence. The assessment task instructions have been written for Microsoft Project.
1 Setting the save options and auto saving
(a) Open Microsoft project and save the file in an appropriate place.
(b) Set the autosave option to save your work to this chosen area every 15 minutes, to protect against power failure, etc.
2 Starting a new project
Enter the project start date.
3 Adding additional project properties information
Enter an appropriate project title, ‘Marketing Survey’ as the subject, your name as the author, ‘John Smith’ as the manager, and ‘Mercury Logistics’ as the company.
4 Creating a new base calendar for the project
(a) Using the standard calendar as a copy template, create a new calendar for the marketing survey project giving it a suitable name. Enter all common holidays and ensure the working times are correct for the project.
(b) Apply the project calendar to the project in general. (Project Information)
(c) Apply the project calendar to the Gantt chart area.
(d) Apply the project calendar in the task information dialogue box for all tasks. (Task Information)
5 Creating a resource pool
(a) Create a resource sheet showing all of the project resources and associated costs. Do not enter a cost for the project expenses as these will be entered as a fixed cost a little later in the project. The presentation equipment should be added as a ‘work’ resource with the appropriate cost per day rather than a cost per hour.
(b) Apply the project calendar to all of the resources.
(c) Enter a note in the resource information for David Beckham that he will take a business trip to Paris for an international logistics conference which will take five days starting on the first Monday in April.
6 Individual resource calendar
(a) Create a calendar for David Beckham based upon the project calendar. You should add the five-day business trip to David Beckham’s calendar.
(b) Apply David Beckham’s Calendar to him on the resource sheet.
7 Entering project key stages, sub tasks and details
(a) Enter all of the key stages, sub tasks and milestones. Ensure the subtasks and milestones are indented under the appropriate key stages tasks.
(b) Enter the durations against the tasks.
(c) Using task information (for all tasks) ensure the following details are shown:
Deadline: NA
Constraint type: As soon as possible
Constraint date: NA
Task type: Fixed Units
Calendar: None
Select OK
(d) Establish the relationships (dependencies) between the tasks.
(e) Enter a description of the deliverable for each milestone in the task information note against each milestone.
(f) Select a suitable calendar scale for the Gantt chart so most of the chart can be viewed in a single pane.
8 Assigning resources to tasks and fixed costs
(a) Assign resources to each sub task as suggested in the emails.
(b) Insert a fixed cost column in Table: Entry in the Gantt chart view and enter the budget for expenses against the end of project milestone.
Additional information
The project completion date may fail to meet the time constraint set for the project. John Smith has asked you to reduce the length of the project by 10 days or more and ensure that the completion date of the project should beat the ‘end of June’ deadline.
John Smith has decided to have some other project staff to take over some of David’s ‘analysis of survey results’ tasks to reduce his workload. Then the analysis tasks undertaken by different project members can take place at the same time, so the length of the project can be reduced as well. Additional copies of the software package should be required and hired for these changes of work allocation.
John has also decided to speed up the production of the presentation in the final ‘presentation of survey’ stage by adding two more project team staff resulting in halving the six-day completion time.
9 Shortening the project and resolving resource problems
(a) Alter your project so that two of David Beckham’s analysis tasks are replaced by Kate Beckinsale and Michael Owen. Additional copies of the software package (e.g. ‘software 2’ and ‘software 3’ which are at the same hire rate as the first copy of the software package) should be added as resources for Kate and Michael’s ‘new’ analysis tasks. These adjustments will not change the originally allocated durations of the analysis tasks involved.
(b) Alter your project so the analysis tasks undertaken by different team members can take place at the same time. Ensure that dependencies between the related tasks should be adjusted accordingly. The subsequent task of comparing survey results should be undertaken when all the analysis tasks have been completed.
(c) Add two other members of the project team to help Emma Watson and Harry Kane in producing the final presentation. The extra help should cut down the duration from six days to three.
10 Critical Path
Either show the critical path on the Gantt chart view, or in Table: Entry insert a column to show the critical path.
11 Analyse charts and reports
You have been asked to create a short summary update of the project costs and resource usage for the Board of Directors. This may take the form of a presentation or suitable alternative format.
(a) Open a blank PowerPoint (or alternative application) and Name it Project Summary Update followed by your name. Insert these details into the presentation.
(b) In Microsoft Project, take a screenshot of the Gantt chart (more than one may be required) and place this into your presentation.
(c) Provide an explanation of the information that the chart displays.
(d) In Microsoft Project in Reports create a Resource Overview Report* and take a screenshot and place this into your presentation.
(e) Provide a brief explanation of the resource usage shown in the Resource Overview Report.
(f) In Microsoft Project in Reports (in dashboards) create a Cost Overview Report* and take a screenshot and place this into your presentation.
(g) Provide a brief explanation of the costs shown in the Cost Overview Report.
* The two reports specified are not available in versions of pre 2013 Microsoft Project. Alternative reports include ‘Resource Remaining Work Report’ or ‘Resource Work Summary Report’ for resource overview and ‘Baseline Cost Report’ for cost overview, to allow each learner to meet the evidence requirement ‘generate meaningful annotated reports and charts with appropriate scales’.
Having saved you completed project and the presentation, send your tutor an electronic copy of the completed project and presentation ensuring each has your name in each file name.
请加QQ:99515681 邮箱:99515681@qq.com WX:codinghelp
- Instagram营销软件,ins群发引流工具/ig拉群/ins业务咨询大轩
- 世贸通美国投资EB-5移民:谁不想投资这样一个EB5项目?
- instagram最靠谱群发引流营销软件,ins最强自动采集粉丝工具
- 国际市场 我有WhatsApp拉群营销工具 我无所畏惧
- 再突破!仁济医院嘉定分院完成国产单孔机器人医源性输尿管狭窄修复术
- ins拉群软件:智能品牌推广的引擎
- 西部数据通过ASPICE CL3评估认证,满足汽车行业不断变化的需求
- Ins拉群软件,Instagram引流助手,让你的营销无往不利!
- 办公减碳3000吨!远东电缆携手法大大电子合同,响应绿色办公
- Instagram群发筛选软件,Ins群发注册工具,助你轻松营销!
- Telegram拉群软件,尝试这款Telegram工具,你会发现成功就在你的指尖之间
- 新点软件荣获上海市大数据中心2023年度软件开发优秀服务商奖
- 数字经济时代,环保水务科技产业十大战略技术趋势
- instagram营销推广新软件!Ins博主推荐群发打粉软件,Instagram利器分享!
- WhatsApp代群发专业服务,全球推广,助您拓展国际市场
- 贵州桃花源新型材料有限公司负氧离子全屋整装增添了空间的独特韵味
- Instagram精准营销打粉攻略,Ins引流软件利器助你成功!
- Yeelight易来宣布通过Works with Sonos认证,打造顶级智能声光体验
- 数字引擎 专家教战 WhatsApp拉群营销工具是我业务成功的高效引擎
- 智能合约的数字跨境电商:什么才是好用的WhatsApp协议号注册器
- 做完近视手术,爱尔英智眼科医院王文娟主任提醒您还需注意这3点
- Instagram营销软件,ins营销引流怎么做/手把手教你ins群发引流
- instagram营销软件,ins群发拉群助手,爆粉营销欢迎测试联系
- 创意传媒巨星 WhatsApp拉群工具助你打造独特营销手法 让消息成为关注焦点
- 国际市场的领军者都在用 WhatsApp拉群营销工具成就你的国际版图
- 北京星来律师事务所三周年庆典暨第三届星来企业合规高端论坛成功举办
- 代写program程序、代做Python/Java编程
- 引领商业潮流的秘密武器WhatsApp工具带你走在时代前沿
- Ins拉群营销软件,Instagram引流工具,让你的营销如虎添翼!
- 热辣滚烫!2024低代码6大趋势
推荐
- 苹果罕见大降价,华为的压力给到了? 1、苹果官网罕见大降价冲上热搜。原因是苹 科技
- 疫情期间 这个品牌实现了疯狂扩张 记得第一次喝瑞幸,还是2017年底去北京出差的 科技
- 全力打造中国“创业之都”名片,第十届中国创业者大会将在郑州召开 北京创业科创科技中心主办的第十届中国创业 科技
- 丰田章男称未来依然需要内燃机 已经启动电动机新项目 尽管电动车在全球范围内持续崛起,但丰田章男 科技
- 升级的脉脉,正在以招聘业务铺开商业化版图 长久以来,求职信息流不对称、单向的信息传递 科技
- 创意驱动增长,Adobe护城河够深吗? Adobe通过其Creative Cloud订阅捆绑包具有 科技
- 智慧驱动 共创未来| 东芝硬盘创新数据存储技术 为期三天的第五届中国(昆明)南亚社会公共安 科技
- B站更新决策机构名单:共有 29 名掌权管理者,包括陈睿、徐逸、李旎、樊欣等人 1 月 15 日消息,据界面新闻,B站上周发布内部 科技
- 如何经营一家好企业,需要具备什么要素特点 我们大多数人刚开始创办一家企业都遇到经营 科技
- 老杨第一次再度抓握住一瓶水,他由此产生了新的憧憬 瘫痪十四年后,老杨第一次再度抓握住一瓶水,他 科技